ABRAHAM10.DAT
-
Monthly demand repair parts large/heavy equip. Iowa 1972 - 1979. Source:
Abraham & Ledolter (1983).
-
BOXJENK10.DAT
-
Gas furnace data (i) input gasrate (ii) output %CO2. Source: Box &
Jenkins (1976).
-
CO2.DAT
-
Carbon dioxide output from gas furnace: percent of output gas. Sampling
interval 9 seconds. Source: Box and Jenkins. See METHANE.DAT and GAS2.DAT.
-
EGDEMAN.DAT
-
Measurments of center thickness (inmils) and axial difference (in mils)
of 25 contact lenses pulled from the production process at regular intervals.
Tolerances: 0.4mil +/- 0.01 mil for center thickness; axial difference
must be less than 0.0025 mil. Source: Hipel and Mcleod (1994).
-
ENGINES.DAT
-
Motor vehiclesengines and parts/CPI, Canada, 1976-1991. Source: Hipel and
Mcleod (1994).
-
GAS2.DAT
-
Combination of METHANE.DAT and CO2.DAT. Source: Box and Jenkins.
-
GRANT.DAT
-
100 measurments of pitch diameter of threads on aircraft fittings. Values
expressed in units of 0.0001 inch in excess of 0.4 inch. Specification
call for "37 plus or minus 13". Each successive group of five readings
are items consecutively produced at time about one hour apart. Source:
Hipel and Mcleod (1994).
-
ISH66.DAT
-
Quality control data from Ishikawa, 5 measurements per day. Each row shows
five measurements taken at successive times on a given day. Source: Hipel
and Mcleod (1994).
-
JENKINS8.DAT
-
Power station data: in-phase current deviations. Source: Jenkins &
Watts (1980).
-
JENKINS9.DAT
-
Power station data: out-of-phase current deviations. Source: Jenkins &
Watts (1980).
-
JENKINS10.DAT
-
Power station data: voltage deviations. Source: Jenkins & Watts (1980).
-
JENKINS11.DAT
-
Power station data: frequency deviations. Source: Jenkins & Watts (1980).
-
METHANE.DAT
-
Methane input into gas furnace: cu. ft/min. Sampling interval 9 seconds.
See CO2.DAT and GAS2.DAT. Source: Box and Jenkins.
-
montgome6.DAT
-
Weekly demand for crankshaft (p.271, Montgomery: Fore. & T.S.). Source:
Montgomery & Johnson (1976).
-
montgome13.DAT
-
Monthly demand for plastic container (p.275, Montgomery). Source: Montgomery
& Johnson (1976).
-
MWM10.DAT
-
CFE specialty writing papers monthly working days. Source: Makridakis &
Wheelwright (1989).
-
OSHORTS.DAT
-
57 consecutive daily overshorts from an underground gasoline tank at a
filling station in Colorado. If y(t) is the measured amount of fuel in
the tank at time t and a(t) is the measured amount sold minus the amount
delivered during the course of day t, then the overshort at the end of
day t is defined as y(t) - y(t-1) + a(t). Source: Brockwell and Davis.
-
PANKRATZ8.DAT
-
% time that parts for industrial project available when needed (weekly).
Source: Pankratz (1983).
-
PAPER.DAT
-
Paper-making process data (Tee and Wu). Out put and input variables. Source:
Hipel and Mcleod (1994).
-
ROCKY.DAT
-
Rockwell hardness (measured on rockwell "B" scale), 100 coils produced
in sequence at a Chicago Steel Mill. Source: Hipel and Mcleod (1994).
-
SFBW2.DAT
-
Operation of a papermaking machine. Stock flow (gal/min) and basis weight
(lb/3300 sqft). Source: Pandit and Wu, pp.500-501.
-
SFINP.DAT
-
Stock flow of a papermaking machine (gal/min). (First column of SFBW2.DAT)
Source: Pandit and Wu, pp.500-501.
-
STRIKES.DAT
-
Number of strikes in the USA. 1951 - 1980. Source: Brockwell and Davis,
Example 1.1.3.